Who this checklist is for
-
Step 1: Map every exterior zone before you request a single price
-
Step 2: Get the bega lighting price list in writing (and check the date)
-
Step 3: Separate exterior fixtures from interior ones
-
Step 4: Price the install, not just the fixture
-
Step 5: Coordinate electrical work with your facilities team
-
Step 6: Verify delivery, returns, and warranty in writing
-
Step 7: Build a delivery-day acceptance checklist
-
What usually goes wrong
Who this checklist is for
I've been the office administrator for a 140-person company for the past four years. I handle facilities purchasing—roughly $75,000 a year across a dozen vendors. Exterior lighting was not something I trained for. When we first looked at upgrading our building's outdoor fixtures back in 2022, I genuinely didn't know the difference between a bollard light and a wall luminaire. I just knew our maintenance crew was replacing bulbs every other week.
This checklist is what I wish someone had handed me. It's seven steps, in order. Skip one and you'll probably end up re-doing it—or explaining to finance why the budget looks different from the quote.
Step 1: Map every exterior zone before you request a single price
This sounds obvious, but I've seen it go sideways. Before you contact anyone about bega exterior lighting, walk the property and make a plain list of zones:
- Entry and exit paths
- Parking areas and driveways
- Steps and level changes
- Building facades (wall luminaires)
- Landscape beds and signage
For each zone, note what's currently there, what's failing, and what you actually want the light to do. A path light and a wall luminaire solve completely different problems. If you call a vendor and say "we need some outdoor lights," you'll burn a week just figuring out what you meant.
One thing I learned the hard way: our loading dock needed a bar light—a linear fixture mounted on the wall—not a spotlight. I originally ordered spotlights and they created hot spots that made forklift work harder than it needed to be. The bar light gave us even coverage. Nobody tells you this stuff upfront.
Step 2: Get the bega lighting price list in writing (and check the date)
This is where most office admins get stuck. You ask for pricing, someone sends a PDF, and you're not sure if it's current. My rule: always ask for the bega lighting price list as of a specific month and year.
When I requested pricing in Q4 2024, I asked the rep to confirm the effective date. Turns out some of the literature floating around was from 2023 and a few numbers had shifted. Nothing catastrophic, but enough to throw off my budget spreadsheet by about $600.
A more specific tip: ask for unit pricing on the exact model numbers you're considering, not just a general catalog. The catalog is fine for planning what types of fixtures exist, but you can't take a catalog price to your finance director and expect clean approval.
Also ask whether the price list includes or excludes:
- Shipping/freight
- Driver costs (bega fixtures often need specific LED drivers)
- Volume discounts
- Lead times
I once assumed a price included the LED driver. It didn't. That was a $900 surprise on a project where I'd already committed my budget. I do not make that mistake twice.
Step 3: Separate exterior fixtures from interior ones
This matters more than you'd think. If you're also handling interior lighting in the same renovation—which, as an office admin, you probably are—keep the tracks separate.
bega's strength is exterior architectural lighting: path lights, bollards, wall luminaires, spotlights, downlights, and the drivers that go with them. If your project also includes a chandelier lamp for the main lobby, that's a different procurement stream. Interior decorative fixtures and exterior specification-grade fixtures don't come from the same line, and trying to bundle them onto one purchase order just makes your invoicing a mess.
I made this mistake in 2023. I tried to order a chandelier lamp and exterior bollards on the same PO. The chandelier wasn't available through our exterior lighting vendor. By the time I untangled it, we'd lost two weeks and my electrician had already scheduled another job.
Now I keep two tracks: exterior (bega) and interior (whatever the designer specifies). Separate quotes, separate approvals, separate delivery schedules.
Step 4: Price the install, not just the fixture
This is where total cost vs. sticker price actually matters. In my experience managing six exterior lighting projects over four years, the lowest quote has turned out to be the lowest total cost maybe 40% of the time. The rest of the time, hidden costs ate the savings.
The cheapest fixture isn't cheap if it fails in 18 months or needs a driver that costs almost as much as the light itself. When I calculate cost now, I include:
- Fixture cost (each)
- Driver cost (if not included)
- Mounting hardware
- Installation labor (get your electrician's hourly rate)
- Conduit/wiring upgrades if needed
- Permit or inspection fees (if your jurisdiction requires them)
When I first started, I only looked at the fixture price. That $85 path light looked great next to the $130 option. But the $85 model needed a separate driver that cost $45, plus extra mounting hardware that wasn't included. The $130 option was complete. No brainer once I did the math.
Ask your electrician for a rough install estimate before you commit to a fixture. Install labor is often 40–60% of the total project cost. That's not a rounding error.
Step 5: Coordinate electrical work with your facilities team
Exterior lighting means electrical work. That means planning for shutdowns, access, and the parts of the building that share the same circuits.
Here's the one that catches people off guard: if your building has a wall heater with a pilot light, and the electrical work touches that circuit, someone needs to know how to turn off the pilot light on that wall heater before work starts. This has nothing to do with lighting, but I've seen a facilities tech start a job and then spend 40 minutes trying to relight a pilot light because nobody coordinated it. (Last time this happened, I added it to our pre-work checklist. Simple fix, avoided a cold Monday morning.)
Before work starts, confirm:
- Which circuits will be affected
- Whether any building systems (heating, ventilation, anything with a pilot light) share those circuits
- Who on the facilities team handles shutdown/restart
- What time the work starts (early morning is usually best)
Step 6: Verify delivery, returns, and warranty in writing
B2B lighting orders aren't like buying a lamp from a retailer. Once you order, you usually can't just return it because you changed your mind.
Ask for:
- Lead time (in business days, not "about two weeks")
- Minimum order quantities
- Return policy (most specification-grade fixtures are non-returnable)
- Warranty terms (years, coverage, who handles claims)
I always get the lead time in an email. Verbal promises are fine, but when your rep says "about two weeks" and the order shows up in five, you want something to point to.
Quick example: our last order was quoted at 12 business days. It arrived in 16. Because I had the email, we adjusted the install schedule without drama. If I hadn't, our electrician would have shown up to a job site with nothing to install—and a trip charge for sending him home.
Step 7: Build a delivery-day acceptance checklist
The best part of a finished lighting project: walking through the property at dusk and seeing everything work exactly as planned. After weeks of quotes, revisions, and schedule changes, that moment is worth it. I don't love procurement, but I do love that first successful walkthrough.
But you only get there if delivery goes smoothly. Have a checklist ready:
- Count boxes against the packing slip
- Check model numbers against the order
- Inspect for damage (photograph anything questionable before signing)
- Confirm drivers and mounting hardware are included
- Store fixtures in a secure, dry place until install
We lost a week because two boxes out of 24 arrived damaged and I signed for them without opening them. The vendor replaced them, but it took 10 days. Now I open everything on delivery day. No exceptions.
What usually goes wrong
Three things trip people up, every time:
- Assuming the price list is current. Always verify the date. Prices shift—especially with LED driver supply chains being what they are.
- Forgetting about the driver. Some fixtures include them, some don't. This is where unexpected costs come from.
- Not coordinating shutdowns. Whether it's your wall heater's pilot light or a shared circuit, someone has to know what's turning off and when. That someone is usually you, the office admin.
One last thing: this was accurate as of early 2025. B2B lighting pricing and availability can shift, so verify current rates and lead times before you finalize your budget. I've watched quotes move by 8% in six months. Your mileage may vary (unfortunately).
Take the seven steps seriously and you'll avoid most of the pain. Skip them and you'll learn the same lessons I did—just more expensively.